


BRB Reaches McDonald’s Milestone!
BRB has now completed over 50 McDonald’s refits since it started working with Pacific Building in 2010.
Heating Installs for Energy Assistance Package
Client: Scottish Gas Location: Various throughout Scotland The contract is for same day installation of gas central heating systems in occupied residences for Warm Deal and Energy Assistance Packages. BRB arrange suitable appointments directly with tenants for the...
Easthall Park Housing Association Phase 1
Client: CCG (Scotland) Ltd Location: Easterhouse, Glasgow Electrical contract for 65 new build houses. Works included all housing electrical services, street lighting, stair lighting, door entry systems, communal television and satellite TV systems, ventilation...
Museum Hall, Bridge of Allan
Client: Imagine Developments Location: Bridge of Allan, Stirling Conversion of B listed building into 15 luxury flats. Plumbing works included bathroom suite installations, mains gas and water and full testing of all drainage. Electrical works included general...
Almond Housing Association
Client: CCG (Scotland) Ltd Location: Livingston Contract to provide all electrical services to 30 new build houses at former Beatlie School site in Livingston. Works also include street lighting, stair lighting, door entry systems, communal television and satellite TV...
Ardenglen Housing Association
Client: CCG (Scotland) Ltd Location: Castlemilk, Glasgow Wiring of supplies and controls to new central heating systems for 70 houses, installed as part of the housing association’s upgrades to their tenants’ properties. Services:...
Easthall Park Housing Association Phase 2
Client: CCG (Scotland) Ltd Location: Easterhouse, Glasgow Electrical contract for 76 new build houses. Works included all housing electrical services, street lighting, stair lighting, door entry systems, communal television and satellite TV systems, ventilation...
Link Housing Ltd
Client: Scottish Gas Location: Various throughout West Scotland Works comprised the installation of 300 replacement gas boilers to occupied housing association residences. BRB arranged all appointments directly with the residents. All works were carried out in close...